Boyertown Foundry Addition |
|||||||||||||||
|
|||||||||||||||
A
22,500 square foot pre-fabricated metal building foundry addition. The
existing mechanical room is being renovated and includes glass windows
to allow potential customers to see boilers manufactured by the client
is use at the facility. ADA Accessibility renovations are also being completed
to bring the existing building up to code. |
|||||||||||||||
Latest
construction photo showing the foundation wall with reinforcement bar
installed. |
|||||||||||||||
Construction Photos |
|||||||||||||||
The discovery of an unknown storm water pipe requires the foundation wall to be bridged to allow the pipe to continue through the addition undisturbed |
The same storm water pipe temporarily supported with a steel pipe while the footing for the addition is installed below |
||||||||||||||
|
|||||||||||||||
| Foundation wall being installed. The reinforcing bar for future pier columns to support the pre-manufactured metal building have been installed. | |||||||||||||||
Copyright
2004 - 2007 |
|||||||||||||||
|
|||||||||||||||