AI Control Systems Factory Addition |
||||||||||||||
View of completed addition |
||||||||||||||
A
3,200 square foot factory addition to an existing facility. Project construction
started in August of 2006. The new space opens into the existing factory
assembly space through both a cased four foot wide by seven foot high
opening and through an eight foot wide by eleven foot high forklift accessible
entry. there is an open stair to the lower level parts storage room. the
structure was designed to accept a one ton hoist hook at any point along
the beam to facilitate in the construction of the electrical panels constructed
onsite. A ten foot wide by ten foot high overhead door was added to the
rear of the addition near the existing loading area to facilitate shipping.
The existing side opening, used primarily by employees and frequent customers,
was made to be handicapped accessible wit hthe addition of a ramped access.
Construction is complete. |
||||||||||||||
Before
Photos |
||||||||||||||
Pre-construction photo from rear to front of building |
Pre-construction photo from front to rear of building |
|||||||||||||
Construction Photos |
||||||||||||||
Installation of foundation wall |
Installation of exterior masonry wall |
|||||||||||||
Preparation for floor slab at open stair to lower level |
Exterior wall being painted to match existing building |
|||||||||||||