AI Control Systems Factory Addition

View of completed addition

   
 
A 3,200 square foot factory addition to an existing facility. Project construction started in August of 2006. The new space opens into the existing factory assembly space through both a cased four foot wide by seven foot high opening and through an eight foot wide by eleven foot high forklift accessible entry. there is an open stair to the lower level parts storage room. the structure was designed to accept a one ton hoist hook at any point along the beam to facilitate in the construction of the electrical panels constructed onsite. A ten foot wide by ten foot high overhead door was added to the rear of the addition near the existing loading area to facilitate shipping. The existing side opening, used primarily by employees and frequent customers, was made to be handicapped accessible wit hthe addition of a ramped access. Construction is complete.
 
Before Photos

Pre-construction photo from rear to front of building

Pre-construction photo from rear to front of building

Existing photo from front to rear of building

Pre-construction photo from front to rear of building

 

Construction Photos

Installation of foundation wall

Installation of foundation wall

Installation of exterior masonry wall

Installation of exterior masonry wall

 

Preparation for floor slab at open stair to lower level

Preparation for floor slab at open stair to lower level

Exterior wall being painted to match existing building

Exterior wall being painted to match existing building

 
 